§ 01 Semiconductors · EU · Overview
Netlists, masks, and process recipes are the most export-controlled data a European fab or fabless house owns. Renting a US-parented region to run models over them is a jurisdiction decision, not an IT decision.
§ 02 Answer · Direct
The honest version first, before the regulation table.
A European semiconductor team can use Copperway today for masked inference, and can reserve planned Cyprus capacity through SRA. AGICY does not operate a production AI campus yet — Vasilikos is pre-construction — so anything requiring an operating EU-owned cluster this quarter is a leasing conversation for post-COD, not a live SKU. The stack we are building is RISC-V and compiler-first, which is the part of this sector's supply chain we actually participate in.
| Instrument | Reference | What it obliges |
|---|---|---|
| EU Chips Act | Regulation (EU) 2023/1781 | Establishes the Chips for Europe initiative and a supply-chain monitoring and crisis-response regime for semiconductor capacity in the Union. |
| Dual-Use Regulation | Regulation (EU) 2021/821, Annex I Category 3 & 4 | Controls export, transfer, and brokering of advanced electronics and computing items, including certain technology and software transfers. |
| Trade Secrets Directive | Directive (EU) 2016/943, Art. 2(1) | Protection depends on the holder taking reasonable steps to keep the information secret. |
| NIS2 | Directive (EU) 2022/2555, Annex II | Manufacturers of computer, electronic, and optical products are important entities with supply-chain security and incident-reporting duties. |
§ 03 Response · Per instrument
An architecture answer, not a legal determination. Your classification stays yours.
We are a compute operator inside the Union, not a foundry. Our relevance is that design and simulation workloads can run on EU-sited, EU-owned silicon rather than being exported to a third-country region.
Where processing design technology in a third country would constitute a transfer, keeping the workload in an EU-operated boundary removes that question. We do not give export-control advice — this is an architecture option, not a legal opinion.
Sending process recipes through a provider that reserves training or logging rights undermines the reasonable-steps test. Copperway masks and does not train on customer content; the planned campus is single-tenant-capable.
An open ISA reduces single-vendor hardware dependency in the supply-chain assessment. Our own security posture and its gaps are published in the Trust Center rather than asserted here.
§ 04 Paths · Status
Same status rubric as the Trust Center. Nothing is upgraded without evidence.
| Status | Surface | What it means for you |
|---|---|---|
| Live | Copperway gateway | OpenAI-compatible EU-oriented gateway with a PII vault. Usable today, on someone else's silicon — it is a routing and masking layer, not sovereign capacity. |
| In design | Sovereign Resource Allocation | Reservation instrument for capacity at the planned Cyprus campus. An Allocation is not an executed offtake agreement. |
| Target | Cyprus GPU leasing | Planned post-COD. Published megawatt and unit figures are plan-of-record, not connected capacity. |
| Not held | Operating EU campus | Vasilikos is pre-construction. Nobody is running a production workload on AGICY-owned silicon today. |
§ 05 Evidence · Computed
Every figure below is read from the same calculators that feed the business plan, and carries the status it earned.
| Figure | Value | Basis | What it does and does not say |
|---|---|---|---|
| Modelled all-in cost / M tokens | €4.53 | modelled | Galaxy unit at plan-of-record power and facility cost. Not a price, and not an operating result — the campus is pre-construction.computed/unit_economics.json |
| Interconnect | Switchless Ethernet torus | plan-of-record | Scale-out over standard Ethernet rather than a proprietary fabric — relevant where a customer must audit the whole stack.computed/energy_bess_16mw.json |
| Effective draw per unit | 10.8 kW | plan-of-record | 9 kW unit TDP at facility PUE 1.2. Air-cooled at ~6U, so no liquid-cooling retrofit is assumed for a customer site.computed/energy_bess_16mw.json |
| Phase 1 fleet (planned) | 1,801 units · 540,300 tok/s | plan-of-record | Planned Phase 1 at Vasilikos, Cyprus. Pre-construction — no capacity is operating under this plan today.computed/fleet_capacity.json |
§ 06 Analysis · 1 of 3
Most industries worry about personal data. A semiconductor team worries about technology transfer. A netlist, a mask set, or a process recipe can sit inside export-control scope, which means the question is not only where the bytes are stored but whose jurisdiction can compel the operator holding them and whether processing abroad is itself a controlled transfer.
That reframes the usual sovereign-cloud pitch. Residency in a Frankfurt or Dublin region does not answer it if the operator's parent is subject to third-country compulsion. This is the same CLOUD Act exposure argument we make elsewhere, except the exposed asset is worth a fab-generation of R&D rather than a customer list.
The honest consequence for us: a design team that needs an air-gapped cluster this quarter is not an AGICY customer this quarter. The Vasilikos campus is pre-construction, and we would rather say so than sell a boundary we do not yet operate.
§ 07 Analysis · 2 of 3
We are a compute operator, not a foundry and not an EDA vendor. The part of the semiconductor story we genuinely participate in is the accelerator layer: the planned Cyprus fleet is Tenstorrent Galaxy on RISC-V, scaled out over standard Ethernet rather than a proprietary fabric, and served through a compiler-first stack.
That matters commercially for one reason. If your objection to today's AI infrastructure is single-vendor lock-in at the ISA and interconnect level, an open ISA and switchless Ethernet is a different bet — and it is auditable end to end. If your objection is that you cannot get allocation at all, that is a different problem and we are pre-COD like everyone else building.
Buy Tenstorrent developer hardware today on the public market — that is not gated behind us.
Run masked inference today through Copperway while your own boundary is being built.
Reserve planned Cyprus capacity through SRA if your timeline is post-COD.
§ 08 Analysis · 3 of 3
The useful diligence questions are narrow and they are the same ones we expect to be asked. Who is the contracting entity and what is its ultimate parent. Can the operator be compelled by a third-country authority. Are training and logging rights reserved anywhere in the terms. Can you export weights and traces on exit. Is the interconnect auditable or proprietary.
We publish our own answers, including the unflattering ones, in the Trust Center and the research archive rather than in a sales deck. The cost figures on this page come from the same calculators that feed the business plan, and they are labelled modelled rather than achieved.
§ 07 Questions · FAQ
The questions a procurement or compliance team actually asks, answered without upgrading our own status.
§ 08 Start · Next step
Copperway works now. Reserved capacity is a pre-COD instrument. If you need an operating EU-owned boundary this quarter, we will tell you so.