STATUS: PRE-CONSTRUCTION · SITE A UNDER EXCLUSIVITYNODE: VASILIKOS-01 — 34.7246°N, 33.2247°ECAMPUS: RISC-V PHASE 1 · MULTI-SILICON EVAL · PLANNEDPOWER: 42MW ON-SITE GENERATION · DESIGN TARGETSTATUS: PRE-CONSTRUCTION · SITE A UNDER EXCLUSIVITYNODE: VASILIKOS-01 — 34.7246°N, 33.2247°ECAMPUS: RISC-V PHASE 1 · MULTI-SILICON EVAL · PLANNEDPOWER: 42MW ON-SITE GENERATION · DESIGN TARGET
AGICY.AI
StackTechnology OverviewRISC-V sovereign stackComputeBare-metal EU compute
FacilitiesData CentersWorldwide map & trackerVasilikos Campus42MW sovereign campus briefingSustainability100% renewable mission
HardwareHardware FleetVendor hub · phased COD roadmapTenstorrent GalaxyPhase 1 Blackhole fleet (pre-COD)AESOLAR AlpineEnergy stack · hail-class PV + BESSAMD HeliosPhase 2 open rack-scale (eval · pre-COD)CerebrasPhase 2 · wafer-scale eval (pre-COD)
Submit your Hardware for reviewPropose accelerators for the Vasilikos fleet
GatewayCopperwayEU-sovereign OpenAI-compatible gatewayTry PlaygroundNewLive Copperway demo · PII vaultSovereign Exchange5-year cross-org sovereign plan
ProductsReserve CapacityPre-construction LOI tiersMarketplaceCompute marketplaceGPUs Rent LiveLiveEU partner GPU now · until CODCompute VouchersSovereign compute creditsModel LeaderboardFrontier model rankingsPricingSubscription tiers
WorkloadsComputeBare-metal EU inference & trainingCopperway GatewayOpenAI-compatible EU APIVasilikos Campus42MW sovereign campus briefing
Trust & complianceTrust CenterSecurity portal · docs · statusEU AI ActRegulatory mapping & controlsAI Readiness AuditPublic-data readiness hub
PricingTiers
Capital & EducationInvestInstitutional data room & deal flowAcademyAI training programs
Individuals & Family OfficesLiving in EUNewClass B capital allocation · no visa framingInternationalNewPlan B · equity alternative to property
IntelligenceResearchPublications & portals
CompanyAboutBrand · HoldCo targetMissionCharter & sovereigntyTrust CenterSecurity portal · docs · status
Schedule Briefing
Sign In
§ 00CampusOverview§ ·VideoBriefing§ 01KellerPedigree§ 02CompilerFirst stack§ 03BlackholeGalaxy specs§ 04GDDR6TCO economics§ 05EthernetScale-out§ 06BenchmarksDeepSeek§ 07Open stackDiligence§ 08CerebrasPhase 2§ 09VasilikosCampus§ 10AGICYRelevance
Data Centers · Research Brief

Sovereign AI Campus — Cyprus, Mediterranean, Vendor-NeutralSovereignAICampus—Cyprus,Mediterranean,Vendor-Neutral

The AGICY Vasilikos campus is a purpose-built EU-jurisdiction facility for civil AI workloads — healthcare, education, and public-service programmes. Phase 1 deploys Tenstorrent Galaxy (Blackhole) for air-cooled inference economics; Phase 2 retains slot-ready paths for Cerebras CS-3 / CS-4 and other accelerators that pass AGICY's four selection gates. Status: planned (pre-construction) — not a live hall. Public Pharos-CY / CY-AIF SME antennas are a complement, not a competitor; GPU leasing Cyprus lives on /leasing.

Campus footprintTARGET / PLANNING

Cyprus Vasilikos remains AGICY’s principal Phase 1 campus (pre-construction). Under the planned HoldCo multi-site path, AGICY is advancing a parallel sovereign compute project in Greece — TARGET / planning only. Positioned as a ~20 MW-class Tenstorrent / air-cooled inference campus for EU footprint diversification — separate CapEx; no offtake claimed.

Scroll to Video
42MW
On-site generation (target)
1,801
Galaxy servers (planned)
17T
Tokens / year (target)
PUE 1.2
Design target
Research disclaimer: Performance, pricing, and compatibility figures marked vendor-claimed require independent validation before procurement. Illustrative campus economics only — not investment advice.

Campus Video Briefing

Eight-chapter TTS briefing covering Keller pedigree, compiler-first architecture, Blackhole specs, facility economics, benchmarks, diligence risks, and Cerebras complementarity. Narration script lives in src/lib/dataCentersContent.ts for producer handoff.

Jim Keller & Engineering Pedigree
This is Aphrodite, an AI agent.
1/8

Jim Keller & Engineering Pedigree

Tenstorrent's Blackhole silicon is led by Jim Keller— architect of AMD Zen, Apple mobile SoCs, and Tesla Autopilot hardware. Keller's public thesis emphasises engineering delivery over narrative: predictable AI workloads favour systems you can plan, audit, and operate at facility scale.VERIFIED

AGICY cites Keller's pedigree as a diligence signal, not an endorsement. Silicon Partner compliance: Tenstorrent is an OEM-tier hardware supplier — not a strategic partner validating AGICY's financial model.VERIFIED

A Compiler-First Alternative

Conventional GPU clusters route memory traffic at runtime via warp schedulers and deep cache hierarchies. Tenstorrent positions TT-Forge as compiler-first: tensor movement is planned at compile time for structurally predictable graphs — batch inference, fixed-graph serving, and domain-tuned civil chatbots.VENDOR-CLAIMED

This is a workload-fit argument, not a universal replacement claim. Irregular research training and highly dynamic sparsity may still route to GPU or wafer-scale options per AGICY's compiler-first analysis.DESIGN TARGET

Blackhole Architecture & Galaxy Server

Tenstorrent accelerator card — P150a class form factor

Tenstorrent accelerator module — RISC-V T6 cores (representative hardware imagery)

Vasilikos campus — design visualisation (pre-construction)
Tenstorrent Blackhole board — Galaxy server integration
Blackhole board — 32-chip Galaxy mesh, air-cooled 6U server
  • 32× Blackhole chips per Galaxy server; RISC-V T6 cores with local SRAM per coreVENDOR-CLAIMED
  • ~23 PFLOPs FP8 and ~$110K list per server (vendor-claimed)VENDOR-CLAIMED
  • Air-cooled 6U— ~9–12 kW/rack vs liquid-mandatory high-density GPU podsDESIGN TARGET
  • Phase 1 fleet: 1,801 Galaxy units → 17T tokens/year sustained targetVERIFIED

GDDR6 vs HBM: Facility Economics

Galaxy uses GDDR6external memory; vendor-claimed compile-time prefetch amortises latency for predictable inference access patterns. Peak bandwidth is lower than HBM stacks, but facility TCO favours air-cooled racks without liquid retrofit CAPEX in Phase 1.VENDOR-CLAIMED

Deep dive: GDDR6, Ethernet, and Open AI Infrastructure Economics.

Ethernet Scale-Out

On-die Ethernet enables Galaxy clusters to scale on standard datacenter fabric — auditable networking without mandatory proprietary link layers. Vasilikos provisions diverse 100GbE/400GbE paths to European IXPs and Mediterranean submarine cable diversity (ARSINOE, UGARIT).DESIGN TARGET

Galaxy & DeepSeek Benchmarks

Tenstorrent reports ~350 tok/s on DeepSeek-R1-class inference and ~$6/M tokens vs ~$30/M on GB300-class systems in vendor presentations. Independent pre-launch testing measured 255 tok/s(EE Times) — plan with a 255–350 tok/s range until AGICY publishes SC-36-class benchmarks.VENDOR-CLAIMED

~90% Hugging Face model compatibility is vendor-claimed for mainstream open-weight imports via PyTorch / TT-Forge.VENDOR-CLAIMED

Open Stack & Diligence Risks

Open ISA (RISC-V), PyTorch, and Hugging Face reduce runtime lock-in — aligned with EU sovereign audit requirements. Standard pre-production risks remain: SDK maturity, yield, firmware stability, leadership continuity, and supplier concentration (including reported acquisition interest).DESIGN TARGET

Full checklist: Tenstorrent Blackhole: Performance Claims and Risks.

Cerebras for Throughput-Critical Workloads

Galaxy is Phase 1 primary — cost-efficient, air-cooled inference for civil workloads at scale. Cerebras CS-3(WSE-3) is evaluated as a Phase 2 option for latency-critical and training-scale jobs. Cerebras announced CS-4on 18 August 2026 (Nexus rack, three WSE-3 Turbo wafers — not a WSE-4 die). Neither SKU is an AGICY order. CS-3 vendor-claimed ~1,500–2,100 tok/s on Llama 3.1 70B-class models, 44 GB on-chip SRAM, weight streaming to 24T-parameter training configurations.VENDOR-CLAIMED

Liquid-cooled CS-3 requires facility retrofit — planned in Phase 2/3 expansion halls. This is complementary silicon routing, not competitive vendor bashing: Galaxy economics today, frontier training optionality tomorrow.DESIGN TARGET

Read more: Cerebras CS-3 / CS-4 hardware · CS-3 research (July 2026).

Vasilikos Campus Infrastructure

Tier IV design target with 2N redundancy, Mediterranean free-cooling advantage, and 42 MW on-site generation (design target) — distinct from the 16.2 MW modelled fleet IT load. Four-phase scale is 7,200 Galaxy servers. Pre-construction; not live megawatts. The campus is engineered for high-density AI — not retrofitted colocation.DESIGN TARGET

Campus footprintTARGET / PLANNING

Cyprus Vasilikos remains AGICY’s principal Phase 1 campus (pre-construction). Under the planned HoldCo multi-site path, AGICY is advancing a parallel sovereign compute project in Greece — TARGET / planning only. Positioned as a ~20 MW-class Tenstorrent / air-cooled inference campus for EU footprint diversification — separate CapEx; no offtake claimed.

SpecificationPhase 1Full Build-Out
On-site generation42 MW (target)Phased expansion
Fleet IT load16.2 MW (modelled)—
Galaxy servers1,8017,200 (four phases)
CoolingAir + free coolingHybrid air + liquid (Phase 2+)
Network100GbE uplinks400GbE backbone

AGICY Relevance

Why this matters for sovereign clients

Public framing per vendor_neutral.md: “Sovereign compute campus, certified for EU workloads; Phase 1 on Tenstorrent Galaxy; architecture supports alternate accelerators via open compilation stacks.”VERIFIED

Phase 1 Galaxy + Phase 2 Cerebras option = breadth for civil workloads — batch inference and education sandboxes on air-cooled economics; frontier training and ultra-low-latency paths where wafer-scale silicon wins on the four gates (performance/watt, TCO, EU supply chain, auditability).

Related research articles

The Compiler-First Challenge to GPU OrthodoxyArchitectureGDDR6, Ethernet, and Open AI Infrastructure EconomicsInfrastructureTenstorrent Blackhole: Performance Claims and RisksDue diligence

Request a Campus Briefing

Workload-matched tours and technical diligence for EU-regulated organisations.

Contact Data Center Team →Technology Stack
Sovereign ComputeResearch HubSustainability

§ FIN — Close of Document

Ready to build on sovereign infrastructure?

Schedule a confidential briefing with our team. NDA-protected, no commitment.

Schedule a briefing →
EU JURISDICTION · CYPRUSGDPR ART. 28 DPA-READY · BY DESIGNNIS2-ALIGNED · BY DESIGNEU AI ACT ART. 12 LOGGING SUPPORT · BY DESIGNRISC-V NATIVE · OPEN ISA

Design-alignment statements for a pre-construction facility — not certifications or attestations. Basis: compliance FAQ, § 08. Careers: we aim for 50-50 gender balance across hiring cohorts.

AGICY.AI

Advanced Governance & Intelligence Cyprus

The sovereign architecture for the Cyprus mind.
Humanitarian mandate: civilian public benefit only — healthcare, education, civil resilience. Civilian / humanitarian mandate only.
Office: 8 John Kennedy Street, Iris House, 7th floor, 3106 Limassol, Cyprus
+357 95 572 777 · 08:30 – 19:00 · agi@agicy.ai
VASILIKOS ENERGY CENTRE, LIMASSOL DISTRICT · PRE-CONSTRUCTION
34.7246°N · 33.2247°E
Principal campus: Cyprus Vasilikos (Phase 1). Parallel HoldCo path: sovereign compute project in Greece (TARGET / planning) — ~20 MW-class Tenstorrent / air-cooled inference positioning for EU diversification; separate CapEx, no offtake claimed.

The Ledger — monthly briefing
  • CopperwayEU-sovereign OpenAI-compatible gateway
  • Try PlaygroundNewLive Copperway demo · PII vault
  • Compression & PII vaultNewSovereign path controls in Playground
  • Sovereign Exchange5-year cross-org sovereign plan
  • ComputeBare-metal EU inference & training
  • UPDATED on GitHubAGICY AI desktop beta · source
  • Reserve CapacityPre-construction LOI tiers
  • MarketplaceCompute marketplace
  • GPUs Rent LiveLiveEU partner GPU now · until COD
  • Compute VouchersSovereign compute credits
  • Model LeaderboardFrontier model rankings
  • PricingSubscription tiers
  • Research HubWave-1 publications index
  • Data CentersWorldwide map & tracker
  • Vasilikos Campus42MW sovereign campus briefing
  • Copperway vs gatewaysConcessive pricing & capability evidence
  • OpenRouter alternativesLiteLLM · Portkey · Copperway
  • EU alternative to OpenRouterCLOUD Act / sovereignty buyer guide
  • Copperway vs LLM gatewaysCapability evidence & SRA economics
  • GDPR-compliant AI hostingEU residency & processing path
  • Cerebras vs GroqInference speed & sovereign options
  • CLOUD Act riskUS parented API exposure
  • AI Act Digital OmnibusArticle 50 transparency duties
  • Sovereign cloud truthLabel vs residency — buyer checklist
  • EU AI ActRegulatory mapping & controls
  • AboutProject identity & status
  • GitHubAGICY AI public source · AGiOS-Ai-EU
  • MissionCharter & sovereignty
  • CareersCulture, benefits & hiring ethos
  • Open PositionsEngineering, research & operations roles
  • Ethics & CharterAnti-misconduct & responsible AI
  • Editorial & MethodologySources, claims, corrections
  • Trust CenterSecurity portal · docs · status
  • InvestInstitutional data room & deal flow
  • Living in EUIndividuals & FOs · Class B allocation
  • International investorsPlan B · Greece / Cyprus rails · Class B
  • Equity participation (legacy)CY & GR individual interest · counsel-gated
  • AcademyAI training programs
  • ContactBriefings & inquiries
  • Privacy PolicyGDPR · data processing
  • Terms of ServicePlatform usage terms
  • Cookie PolicyTracking & consent
  • SRA TermsReserve capacity agreement
  • Gateway Pricing DisclaimerCopperway pricing basis
© 2026 AGICY· PROJECT / BRAND OPERATOR · AGICY HOLDINGS LTD — NAME REGISTRATION APPLICATION COMPLETED · AWAITING APPROVAL · CORP DOCS TO FOLLOWDOC: AGICY.AI · REV 2.0 · SOVEREIGN LEDGER
AGICY